Page 184 - Special Topic Session (STS) - Volume 3
P. 184
STS539 Chenglong Li
References
1. Haridy, S., Wu, Z., Lee, K. M. & Bhuiyan, N. 2013. Optimal average sample
number of the SPRT chart for monitoring fraction nonconforming.
European Journal of Operational Research, 229, 411-421.
2. Li, Y., Pu, X. & Tsung, F. 2009. Adaptive charting schemes based on
double sequential probability ratio tests. 6 Quality and Reliability
Engineering International, 25, 21-39.
3. Ou, Y., Wu, Z., Khoo, M. B. C. & Chen, N. 2015. A rational sequential
probability ratio test control chart for monitoring process shifts in mean
and variance. Journal of Statistical Computation and Simulation, 85,
1765-1781.
4. Ou, Y., Wu, Z., Yu, F.-J. & Shamsuzzaman, M. 2011. An SPRT control chart
with variable sampling intervals. The International Journal of Advanced
Manufacturing Technology, 56, 1149-1158.
5. Stoumbos, Z. G. & Reynolds, M. R., Jr. 1996. Control charts applying a
general sequential test at each sampling point. Sequential Analysis, 15,
159-183.
6. Stoumbos, Z. G. & Reynolds, M. R., Jr. 1997. Control charts applying a
sequential test at fixed sampling intervals. Journal of Quality Technology,
29, 21-40.
173 |I S I W S C 2 0 1 9