Page 184 - Special Topic Session (STS) - Volume 3
P. 184

STS539 Chenglong Li
                  References
                  1.  Haridy, S., Wu, Z., Lee, K. M. & Bhuiyan, N. 2013. Optimal average sample
                      number of the SPRT chart for monitoring fraction nonconforming.
                      European Journal of Operational Research, 229, 411-421.
                  2.  Li, Y., Pu, X. & Tsung, F. 2009. Adaptive charting schemes based on
                      double sequential probability ratio tests. 6 Quality and Reliability
                      Engineering International, 25, 21-39.
                  3.  Ou, Y., Wu, Z., Khoo, M. B. C. & Chen, N. 2015. A rational sequential
                      probability ratio test control chart for monitoring process shifts in mean
                      and variance. Journal of Statistical Computation and Simulation, 85,
                      1765-1781.
                  4.  Ou, Y., Wu, Z., Yu, F.-J. & Shamsuzzaman, M. 2011. An SPRT control chart
                      with variable sampling intervals. The International Journal of Advanced
                      Manufacturing Technology, 56, 1149-1158.
                  5.  Stoumbos, Z. G. & Reynolds, M. R., Jr. 1996. Control charts applying a
                      general sequential test at each sampling point. Sequential Analysis, 15,
                      159-183.
                  6.  Stoumbos, Z. G. & Reynolds, M. R., Jr. 1997. Control charts applying a
                      sequential test at fixed sampling intervals. Journal of Quality Technology,
                      29, 21-40.









































                                                                     173 |I S I   W S C   2 0 1 9
   179   180   181   182   183   184   185   186   187   188   189