Page 187 - Contributed Paper Session (CPS) - Volume 1
P. 187
CPS1266 Saeed F. et al.
All of cases in the table4 will be available in a separate tab in the software.
In the software, it will be necessary to entry UIN at first and using tabs and
tools to analysis the establishment status. Controlling and errors’ removal is
the major goal of the proposed software. In addition to the mentioned criteria
there are also other measurable and comparable criteria to be considered
significantly. These kind of changes are in:
1. Input-Output, value added and they proportions (especially
industrial value added)
2. Raw materials, products volume, inventory during construction and
they proportions
3. Workforce, men and female, permanent or contemporary
combination and salary trend
4. Inventory, fuel consumption and energy with production and their
proportion
5. Investments, export and production capacities
6. Manufacturing and non-operating expenses and their proportion
The software schematic will be shown in fig5-7 as below. In the software,
all outliers and data inconsistency will be recognized and experts should
resolve the problem or find a reasonable and defendable illustrations.
Fig5. Software schematic for Macro editing
As shown in the fig 5, the first screen of the software includes different
characteristics information of statistical unit, contact information of staffs who
are engage in survey in all levels & establishment and table of the checking
panel. This table also provide a short description of errors and warning which
may experts will face during the purification process. In other tabs of the
software there are other different analysis from ISIC trend analysis and
provincial cutting level statistics to cross checking and conformity with
register-based data (if it is available).
176 | I S I W S C 2 0 1 9